Project

General

Profile

Actions

Development #7084

closed

Feature #7082: Backend Server (M22)

Build Backend Docker deployment

Added by Kyle Chong 3 months ago. Updated 2 months ago.

Status:
Closed
Start date:
23/09/2026
Due date:
25/09/2026
% Done:

100%

Estimated time:
Complete Date:
25/09/2026

Description

Refer to: docs/planning/01_Architecture.md

Package the Backend Server environment so Firebird 5.1 runs through Docker.

Scope:

  • Install/detect Docker as part of Backend deployment.
  • Deploy Firebird 5.1 container.
  • Configure persistent Firebird database storage.
  • Configure required ports/networking.
  • Configure container restart/recovery.
  • Detect Docker:
    • Not installed.
    • Installed but stopped.
    • Running.
  • Detect Firebird container:
    • Missing.
    • Stopped.
    • Running.
    • Unhealthy.
  • Start/restart the required container where appropriate.
  • Preserve database files when container/application is upgraded.
  • Ensure Firebird 5.1 Docker instance can coexist with locally installed Firebird 2.5.
  • Provide useful installation/startup diagnostics.

Done when: POS+ Backend can deploy and run Firebird 5.1 through Docker without conflicting with existing Firebird 2.5 applications.

Actions #1

Updated by Kyle Chong 3 months ago ยท Edited

  • Status set to New
  • Subject set to Set up Backend Firebird database
  • Tracker set to Development
  • Priority set to Medium
  • Parent task set to #7082
  • % Done set to 0

Issue created

Actions #2

Updated by Kyle Chong 3 months ago

  • Subject changed from Set up Backend Firebird database to Build Backend Docker deployment
  • Description updated (diff)
Actions #3

Updated by Kyle Chong 3 months ago

  • Description updated (diff)
Actions #4

Updated by Kyle Chong 3 months ago

  • Assignee set to Muhammad Hazmi Ahamat
Actions #5

Updated by Muhammad Hazmi Ahamat 2 months ago

  • Due date set to 25/09/2026
  • Status changed from New to Dev In Progress
  • Start date set to 23/09/2026
  • % Done changed from 0 to 50
Actions #6

Updated by Muhammad Hazmi Ahamat 2 months ago

  • Status changed from Dev In Progress to Closed
  • % Done changed from 50 to 100
  • Complete Date set to 25/09/2026
Actions

Also available in: Atom PDF