Actions
Development #7440
closedFeature #7106: Product & Master Data Sync (M02)
Test master-data synchronization, recovery & diagnostics
Status:
Closed
Assignee:
Start date:
05/11/2026
Due date:
10/11/2026
% Done:
0%
Estimated time:
Complete Date:
Description
Refer to: docs/planning/modules/M02_Product_Data_Sync.md
Perform end-to-end testing of the M02 synchronization architecture using Qube Admin Portal as the mock QubeBiz publisher.
Validate both flows:
Admin Portal → Kafka → Backend → Kafka → Cashier → Local DB
and
Admin Portal → Kafka → Backend → LAN → Cashier → Local DB
Test at minimum:
- Add master data.
- Update master data.
- Delete/Deactivate master data.
- Duplicate event.
- Out-of-order event.
- Invalid/malformed event.
- Backend restart.
- Cashier restart.
- Kafka unavailable/reconnected.
- LAN disconnected/reconnected.
- Cashier offline and later reconnects.
- Multiple Cashier terminals.
- Initial Cashier bootstrap followed by delta sync.
- Verify useful diagnostics are written when synchronization fails.
Done when: Add/Update/Delete changes are correctly reflected in Cashier through both supported transports, interruptions can recover without manual database repair, and failures provide sufficient diagnostics for troubleshooting.
Actions